PROJECTSHIFT B · 14:32 IST · 412 ON-SITE
PROJECT HEALTH
0.74
▼ 0.05
PLANNED PROGRESS
42.8
%
OBSERVED PROGRESS
36.4
%
▼ 6.4
SCHEDULE SLIP
−8.2
d
PREDICTED SLIP
+11
d
SAFETY SCORE
86.4
%
▼ 2.1
ACTIVE CONTRACTORS
14
WORKERS ON-SITE
412
▲ 8
EQUIPMENT UTIL
62
%
▲ 3
OPEN HAZARDS
6
OPEN PERMITS
38
▲ 2
CRITICAL PATH ITEMS
3
Persistent AI Agents · Construction OS
PROGRESS AGENT
−8d schedule slip · piping
SAFETY AGENT
harness · trench · smoke
CONTRACTOR PRODUCTIVITY
LNT-PIP idle 22m · WF-7
EQUIPMENT AGENT
lift path · proximity
MATERIAL AGENT
valves misplaced · 1 short
QUALITY AGENT
8 spools re-NDT
PERMIT COMPLIANCE
WPMT-3340 expired
DELAY PREDICTION
+11d to commissioning
Site Map · Digital Twin · Live
● SITE TWIN · 14 PKG · 412 PERSONNEL · 38 EQP
DRONE-04 · SORTIE 14:04
SCALE 1:1500 · UPDATED 0.6s AGO · DRONE Δ COMPUTED
ACTIVEHAZARDCRITICALDRONE
CAM-04
Tank Pad C●
CAM-08
Pipe Cor 4●
CAM-11
Excav East●
CAM-14
Scaffold B●
CAM-19
Weld Bay 2●
CAM-22
Lay-down●
Semantic Event Stream
- 14:32:18Safety AgentWorker at height without harness · Tank Pad C · cam 14Tank Pad C
- 14:30:55Equipment AgentCrane lift path overlaps personnel zone · CR-08Lay-down Yard
- 14:28:11Safety AgentPPE: 4 missing helmets · Scaffold B · 3rd liftScaffold B
- 14:25:42Safety AgentOpen trench unbarricaded · 18m · Pipe corridor 4Corridor 4
- 14:22:08Material AgentRebar bundles arrived · GRN-22418 · Gate 2Gate 2
- 14:18:36Permit ComplianceHot work permit expired · WPMT-3340 · still activeWelding Bay 2
- 14:14:51Equipment AgentExcavator EX-04 reversing · person 1.8m proximityExcavation East
- 14:11:09Productivity AgentContractor LNT-PIP idle 22m · 14 workers · WF-7Work Front 7
- 14:08:24Quality AgentQuality: weld bead irregular · Spool SP-118 · re-NDTPipe Yard
- 14:04:02Progress AgentDrone sortie complete · 142 ha · progress delta computedSite-wide
Progress Heatmap · Area-wise % Complete
Excavation
98%-2
Foundation
88%-4
Civil Construction
61%-13
Steel Erection
54%-8
Scaffolding
60%+2
Pipeline Laying
34%-14
Tank Construction
38%-6
Equipment Installation
22%-6
Electrical / Instrument
12%-6
Insulation & Painting
6%-4
PROGRESS AGENT
Pipeline laying is −14pp behind plan. Drone delta confirms only 34% physical vs reported 41%. Forecast slips commissioning by 11d unless 2 welders + 1 spool fab line are added by Friday.Critical Path · Bottlenecks
- Site Mobilization100%
- Excavation98%
- ●Foundation88%
- ●Tank Erection54%
- ●Piping34%
- E&I12%
- Hydrotest + Pre-comm0%
- ●Commissioning0%
DELAY PREDICTION AGENT
3 critical path items at risk. Tank erection → piping → commissioning. Predicted slip +11d. Recovery requires parallel hydrotest start at T-22d.ASK BLUE