RFY · 002
Refinery Operations OS · Jamnagar
LIVE
ACTIVE REFINERY
Jamnagar Refinery
CRUDE CHARGE
1.42
Mbpd
0.03
ENERGY INDEX
92.4
0.2
WORKERS ON-SITE
2,184
12
ACTIVE PERMITS
148
6
OPEN WORK ORDERS
312
9
HSE INDEX
88.2
1.4
TURNAROUND
62
%
3.1
FORECAST SLIP
+2.4d
0.6
3D

Digital Twin · Process Topology

T-01T-02T-03T-04T-05T-06CDU-1CDU-3FCC-2VAPOR PLUME · 0.86HOT WORK · PR-7CRANE · 38T LIFT
JAMNAGAR · UNIT 03 · LIVE TWIN
SCADA tags 4,812 · Δt 1.2s · 312 cams
PU

Process Units

  • CDU-1
    Crude Distillation 1
    358°C
  • CDU-3
    Crude Distillation 3
    364°C
  • FCC-2
    Fluid Cat Cracker 2
    540°C
  • HDS-1
    Hydrodesulfurizer
    320°C
  • RFM-1
    Reformer
    510°C
  • VBU-1
    Visbreaker
    470°C
CAM

Cameras · Semantic Coverage

JAM-CAM-100● REC
CDU-3 Eastthermal 0.86
JAM-CAM-101● REC
FCC-2 Deck 4ppe 0.92
JAM-CAM-102● REC
Tank Farm Aleak 0.74
JAM-CAM-103● REC
Loading Bay 03sop 0.81
JAM-CAM-104● REC
Flare Stack F-2emission 0.69
JAM-CAM-105● REC
Control Roomnone 1.00
JAM-CAM-106● REC
Perim. Northintrusion 0.95
JAM-CAM-107● REC
Perim. Southintrusion 0.88
AI

Live Insight

AI INSIGHT · CONFIDENCE 0.86
Cross-correlated SCADA pressure drop (3-PIC-204 −8.2%) with vapor plume cam JAM-CAM-100. Recommend isolating block valve V-217 and dispatching crew under grade-2 leak protocol.
WO-44812 dispatched
6 crew · 4m ETA
2 hot works active
4 PPE flags / hr